[1] Eberhardt E. Rock slope stability analysis–utilization of advanced numerical techniques. Earth Ocean Sci UBC 2003.
[2] Cruden DM, Varnes DJ. Landslides: investigation and mitigation. Chapter 3-Landslide types and processes. Transp Res Board Spec Rep 1996.
[3] Gurocak Z, Alemdag S, Zaman MM. Rock slope stability and excavatability assessment of rocks at the Kapikaya dam site, Turkey. Eng Geol 2008;96:17–27.
[4] Romana M, Serón JB, Montalar E. SMR geomechanics classification: application, experience and validation. 10th ISRM Congr., International Society for Rock Mechanics and Rock Engineering; 2003.
[5] Wei WB, Cheng YM, Li L. Three-dimensional slope failure analysis by the strength reduction and limit equilibrium methods. Comput Geotech 2009;36:70–80. doi:10.1016/j.compgeo.2008.03.003.
[6] Alkasawneh W, Husein Malkawi AI, Nusairat JH, Albataineh N. A comparative study of various commercially available programs in slope stability analysis. Comput Geotech 2008;35:428–35. doi:10.1016/j.compgeo.2007.06.009.
[7] Bhasin R, Kaynia AM. Static and dynamic simulation of a 700-m high rock slope in western Norway. Eng Geol 2004;71:213–26. doi:10.1016/S0013-7952(03)00135-2.
[8] Stead D, Eberhardt E. Understanding the mechanics of large landslides. Ital J Eng Geol Environ B Ser 2013;6:85–112.
[9] Bellwald P, Dietler T, Mehinrad A. Engineering Geology and Rock Mechanics Report: Report on Compilation of Site Investigations Phase I & II Investigations to Geological Report of Bakhtiary Dam and Hydroelectric Power Project. Stucky Pars Eng Co Poyry Co Moshanir Co 2009.
[10] Dietler T, Mehinrad A, Chehreh H. Geology Report of Bakhtiary Dam and Hydroelectric Power Project. Stucky Pars Eng Co Poyry Co Moshanir Co 2009.
[11] Ashkeshi M, Gheshmipour A, Haftani M, Jamali H, Korkorian H, Salehinia M. Synthesis Report of Bakhtiary Dam and Hydroelectric Power Project. Stucky Pars Eng Co Poyry Co Moshanir Co Dezab Consult Eng 2010.
[12] Mehinrad A, Hamzehpour H. Interim Report on Additional Site Investigations Part B-Rock Mechanics and Geophysical Investigation of Geological Report to Bakhtiary Dam and Hydroelectric Power Project. Stucky Pars Eng Co Poyry Co Moshanir Co 2008.
[13] Mehinrad A, Gheshmipour A. Interim Report on Additional Site and Laboratory Investigations Part B-Rock Mechanics and Geophysical Investigation of Geological Report to Bakhtiary Dam and Hydroelectric Power Project. Stucky Pars Eng Co Poyry Co Moshanir Co 2009.
[14] Sanei M. Investigation constitutive model for major discontinuities of rock massess in Bakhtiary Dam, MSc Thesis. 2012.
[15] Hoek E. Rock Engineering (Course Notes by Evert Hoek). Evert Hoek Consult Eng Inc 2007.
[16] BakhtiaryJointVentureConsultants, Seismic Hazard Report" 2006.
[17] Itasca Consulting Group Inc, 3DEC User’s Guide, Ver 5.0, Minneapolis, Minnesota 2013.